28 September: Founded by a group of four Keio University research project members, including Yoshida, with capital stock of ¥15 million.
2006
28 September: Founded by a group of four Keio University research project members, including Yoshida, with capital stock of ¥15 million.
2007-
2008
Completes the first lithium-ion battery cell.
Completes the electriccity strage system prototype.
2009
25 September:
Opened Kansai Office (Chuo-ku, Osaka City, Osaka Prefecture).
Opened Technology Development Center (Otsu City, Shiga Prefecture).
26 November: Delivered the first stand-alone lithium-ion EV charging station to Kanagawa Prefectural Government.
2010
6 April: Opens the Kawasaki Plant (Kawasaki City, Kanagawa Prefecture). Completes construction of Building P in Kawasaki Plant.
19 May: Launched POWER YIILE large-size lithium-ion electricity storage system.
29 September: POWER YIILE PLUS receives a Good Design Award 2010.
2011
12 August: Awarded the world's first-ever TÜV-S Mark safety standard certification for a large-size lithium-ion battery from international third-party testing and certification organization TÜV Rheinland Japan.
2012
30 March: The POWER YIILE PLUS large-size lithium-ion electricity storage system obtains first certification through a subsidy from the Ministry of Economy, Trade and Industry.
June: Completes construction of Building L and Building E in Kawasaki Plant.
December: Announcement of the development of the Power Storager 10 general-purpose electricity storage system for industrial use.
2013
7 January: POWER YIILE PLUS receives a 2012 Nikkei Superior Products & Services Award (Nikkei Business Daily Award).
18 February: Announcement of the launch of the POWER iE 6 stationary electricity storage system.
18 March: The Kawasaki Office receives the 2012 (19th) City of Kawasaki commendation for contributions to urban landscape development.
4 July: Obtains certification for wide-area collection and transport of general and industrial waste from the Ministry of the Environment.
1 October: POWER iE 6 receives a Good Design Award 2013.
2014
April: Demonstration of bullet penetration test of the battery cell.
September: Launches ELIIY ONE portable electricity storage system.
October Announces the partnership with Enphase Energy in distributed electricity storage systems.
November: ELIIY ONE receives a Good Design Award 2014.
2015
April: Launches POWER iE6 HYBRID solar power generation/electricity storage hybrid system.
2016
April: Launches POWER YIILE 3 electricity storage system for indoor use.
September: POWER YIILE 3 receives a Good Design Award 2016.
October: Launches HY battEliiy P-series starter battery for motorcycles.
December: POWER YIILE 3 receives a JIDA Design Museum Selection Vol.18"Gold Selection Award".
2017
January:
A book about Eliiy Power brought out:
"Challenge to Non-flammable Battery - Hiroichi Yosida,an Entrepreneur from the Age of 69"Nikkei Publishing Inc.
June: Lithium-ion starter battery HY85S for motorcycle is equipped with Honda 2018 model CRF450R/RX as standard.
4 October: Lithium-ion starter battery “HY series battery” receives a Good Design Award 2017.
2018
29 January: Launches POWER iE5 Link electricity storage hybrid system.
June: Lithium-ion starter battery HY110 for motorcycle is equipped with Honda 2018 model CRF1000L Africa Twin as standard.
15 March: Mazda, ELIIY Power and Ube Industries Agree to Jointly Develop 12-Volt Lithium-ion Starter Batteries for Vehicles.
3 October: POWER iE5 Link receives a Good Design Award 2018.
2019
February: Launches POWER YIILE HEYA wall mounting electricity storage system for indoor use.
August: Launches POWER YIILE HEYA S electricity storage system for indoor use.
2 October: POWER YIILE HEYA receives a Good Design Award 2019.
2021
February: Launches Power Storager D20 general-purpose electricity storage system for industrial use.
May: Launches POWER iE5 GRID electricity storage hybrid system.
20 October: POWER iE5 GRID receives a Good Design Award 2021.
2023
14 November: ELIIY Power and Suzuki have entered into an additional investment and business alliance agreement.
2024
March: Launches POWER iE Connect V2H electricity storage system.
April: Opens Research and Development Center for Battery Technology in Kawasaki Plant and Seta Office (former Technology Development Center).